








📊 Plan Like a Pro: Your Projects Deserve the Best!
The Quartet Prestige 2 Magnetic Total Erase Project Planner is a premium 3' x 2' board designed for effective project management. With a durable, ghosting-resistant surface and a 20-year warranty, it features customizable column headings and a magnetic quality for easy status tracking. The board is easy to mount and includes a stylish aluminum frame, making it a perfect addition to any professional workspace.
| Manufacturer | ACCO Brands |
| Brand | Quartet |
| Item Weight | 9.95 pounds |
| Product Dimensions | 43 x 2.25 x 28.25 inches |
| Item model number | PP32P2 |
| Is Discontinued By Manufacturer | No |
| Color | Graphite, White |
| Cover Material | Aluminum |
| Material Type | Metal |
| Number of Items | 1 |
| Size | 3' x 2' |
| Ink Color | Gray |
| Manufacturer Part Number | PP32P2 |
J**E
Quality pre-printed dry erase board.
Since there were no reviews for this board as of the date of this writing I figured I would go ahead and put one up in case it helps someone. I was in need of a dry erase board that had different grids on it when I came across this one. I had looked at several and this one was priced in between buying a blank dry erase board and using grid tape and other more expensive pre-printed boards so I decided to go for it. Item arrived in a tall/slim box, the actual boards box was placed inside of a slightly larger cardboard box for shipping. The board itself seems to be of quality construction and is at least equal to several other dry erase boards I have and it is lightweight for its size. The pre-printed grid lines (both horizontal and vertical) have plenty of room to write in of a size that is legible. Overall I like this board and it fits my needs fine, I plan on keeping it.
M**M
Excellent quality
I am a construction project manager and have up to 20 different projects going at different stages. I use magnets to track their status on the board. Excellent for this!
A**R
Not packaged very well. Took a LONG time to arrive.
I've been looking for a erase board like this to keep track of what step clients are in in my business. It arrived with a few deep scratches on the front of it and one of the corner pieces at the bottom was broken. It took nearly a month long to arrive than was estimated with delivery date. Overall I do love it and am using it despite the defects because it's just for office use. I couldn't find any other erase boards like this. Husband was able to glue to broken corner piece so that it works too.
R**S
Best tool for photography tasking!!!!
We use this to track our tasks for booking/delivering our weddings. It's been useful for my team to stay on top of our workflow. I will say the instructions to put it together leave little to be desired, which made it a little challenging to set up. The board is heavy so you need a strong wall. We are ordering more because we love them so much. My wedding planner office mate uses one too. Amazing for workflow
M**E
Best value for the money
Great quality. Makes it very easy to organize my work in one space.
D**S
Pricey to arrive scratched and scuffed
Was enthusiastic about this board and decided the personal expense was worth the visual project organization. It arrived packaged well and with four dry-erase markers included. However, there are large scratches and scuffs in the whiteboard surface right out of the box and I will never stop noticing them. They don’t buff out with cleaning. I’m disappointed in the quality for the price and would return it if I didn’t feel I need a solution right away. Shop around for better quality/value.
S**B
Awesome board
Awesome, looks fantastic, heavy, solid board (not like heavy 100lbs. But it has a good feel in the weight, not cheap) love the bottom rack, attempted to put together without the instructions (I'm a guy), had to look though.... Have bought many cheap magnetic board in the past, not so cheap dollar wise but material/design wise. This is a first rate board in my opinion.
P**N
AMAZING BOARD
WORKS FOR OUR OFFICE IN BUILDING PERMITS; ADDED THE MAGNETS WITH LABELS - THE TRAY FOR THE MARKERS IS A TRICK TO PUT TOGETHER.
Trustpilot
5 days ago
3 days ago